I don't see the relationship between the two Jacko.
Far as I know, I don't believe Austin's bass WAS delivered to him yet... right?
So if that's true, (and I believe it is...) then it's already obvious that the matters are between him and Alembic. If Alembic delivers Austin bass or not... It has no effect on me, no more than a stumped toe next door, inside my neighbor's house... (Unless he needs my aid...).
I am still consistent with this idea today.
Furthermore, I don't believe statements from anyone here, are pretexts to a magical formula rule for issues to be of -- 'what' is private or 'what' is public.
Anyway...
On a thread Shoji authored, he asked a general question, and members offered him advise...
From there, the problem snowballed... and I receive my bass 3 months later over a faulty LED which was found faultiness, or issues were never duplicated at HQ.
Shoji's matter had implicated (directly and indirectly) halted the progress of my bass being ready by November 09.
I been really quiet about this problem, and I probably would had remained silent, if it was not for this issue turning out so ugly...
Like I said, I was cool with my (3) months late bass, and I dealt with the delay coolly, and in a silent way, and I didn't sound off and blast anyone on my FTC when my bass was delayed...
But to blast Mica over something so trivial, and could had been understood earlier, and something like this, halting production to repair a LED (which was not proven defective), was a hard pill to swallow Bro.
I am a human being, with a soul (contrary what you might think...)
Peace and Love,
Hal-
(Message edited by the_jester on March 08, 2010)