Sorry for the oversight on the control layout, but as you can see, they are already drilled. If you require an alternate layout, you'll need to select another top and back for a new construction. Please let me know your thoughts on this.
The dove inlay will be done very near the end of the process, when only 2-3 more coats of finish are needed. I discussed the inlay with James on Monday, and he agrees with me that in order to get a silver ouline around the dove we'll actually inlay the shell into a sterling silver sheet, then trim the sheet to leave a border around the dove, then inlay that into the fingerboard. Originally we were considering wrapping a silver wire around it, but we don't think that will come out as nicely.
So even though you can't tell there are no inlays on the fingerboard under the tape, I can assure you the fingerboard is indeed blank. I will post a mock up of the artwork based on the design you sent to me and we can review the concept together before we actually do the inlay. I've also asked James to check with me before starting the inlay in case there are any last-minute changes.