It can take a good long time, since the fingerboard needs to be replaced, and there is some time in finish (but we don't know how long until the new board is in place).
Best to plan on a good 4-5 weeks. Also, think about where you want the new controls (like a dimmer for the front ones and a selector switch (side only/both/off)).